Raised floors - Marble and granite

IT / EN
pavimenti, marmi e graniti
CLIENTS

 

DOCUMENTS

Installation

 

The installation begins at point 0 in the structure. When the structure is completed it is time to position it on the floorwith the use of several precision (even laser) instruments. When the structure is positioned is time for the panels to be laid down, beginning from the first row of panels starting from the interior of the structure. It is better to avoid excessively small pieces of panel at the perimeter of the installation. When the raised floor
is without ledgers adhesive must be used to fix the support.
Supports and panels are to be installed together, at
the same time. 24h is the time it takes for the floor to be
ready for use (the glue must adhere). At the end steps,
ramps and accessories will be mounted. The floor must
be protected with some kind of paper covering until the
end of works in the room.

INSTALLATION TIME
The following elements must be taken into count:
size of the rooms
shape of the rooms
possibilities of access to the rooms
panel types
panel covering
chosen structure
A team of two/three persons can install about 30sm of
floor per day in small rooms and about 90/150sm per day
in bigger environments.

It is the task of professional teams of technicians (part of
our staff or free lance) under the coordination of our company staff.

The installation of the raised floor is not subject to particular
problems, however it is better to previously inspect
the rooms which are going to be interested by the installation, to check some basic conditions:

humidity, smoothness of the floor, plaster (must be at least
ten days old), window and door frames completely installed;
pipes for hydraulic, electric, conditioning and phone
plants already laid down (the tracing must be agreed with
our technical office)

SURVEY AND TRACING
After a preliminary survey it is possible to trace the project
for the installation of the raised floor. The supporting
structure of the panels must be projected on the basis of
technical and aestethic requirements of the customer. It is
necessary to check the levels of the floors to avoid them
to be higher than the regulations of the support.

INSTALLATION

It is necessary to clean the slab from dust and to treat it
with anti-dust paint. This treatment is inevitable if the plenum
between the slab and the raised floor is to be used
as a conduct for air-conditioning.
The best way to proceed in the installation is to prepare
an ortogonal datum structure made by two nylon threads
fixed to the walls.

 

Sede legale: 20152 Milano - Via Bagarotti 5 TEL.0039-02-48913784 FAX 0039-02-47994915
Stabilimento: 25044 Capo di Ponte (Brescia) V.le Stazione 8 TEL.0039-0364-42003 FAX 0039-0364-331095

Copyright © 2008 F.lli Moncini Srl. - P.Iva: 01542090152